Project 3: Institutional Logistics

Supply Chain Optimization for a Public Institution

Comprehensive redesign of logistics and inventory management processes to reduce response times and operational costs.

1 The Task

A large-scale public institution faced critical inefficiencies in its supply chain, with procurement times exceeding 30 days and an obsolete inventory system generating significant annual losses. The challenge was to modernize the operation without interrupting continuous service.

2 Our Approach

We implemented a phased analysis methodology, starting with detailed mapping of all material flows and decision points. Standardization of protocols and the introduction of a real-time tracking system were prioritized.

  • Complete audit of suppliers and contracts.
  • Design of a new centralized storage model.
  • Development of a comprehensive dashboard (KPI) for supervision.

3 Implementation

Execution was carried out in close collaboration with internal teams. A unified management platform was deployed, and staff were trained in the new procedures. The transition was gradual, ensuring adaptation in each department.

"The pilot phase in the procurement department demonstrated a 40% reduction in order processing time, validating the model before global deployment."

Key Results

65%

Reduction in procurement times

22%

Savings in annual logistics costs

99.2%

Real-time inventory accuracy

Validation Materials

  • 📊 Process audit report (120 pages)
  • 📈 Performance metrics dashboards
  • 📋 Standardized operating procedure manuals
  • 🎥 Training session recordings
🌍 EN
ES EN